Everlog siding comes pre finished and is packaged in durable crates.
How to install everlog siding.
Mark length needed on siding a template tool can be made to automate markings for square or pitched cuts.
Because everlog siding comes in stock twelve foot lengths it will need to be cut to fit.
Because everlog siding comes in stock twelve foot lengths it will need to be cut to fit.
Measure length of siding needed again allowing for one eights inch gaps on ends.
A forklift is required to unload crates from the trailer.
Slide the bottom of the siding into the footer being sure to allow for expansion.
Mark length needed on siding a template tool can be made to automate markings for square or pitched cuts.
Don t pound the nails in all the way.
Slide the ends under the corner posts in the same manner.
Mark length needed on siding a template tool can be made to automate markings for square or pitched cuts.
Measure length of siding needed again allowing for one eights inch gaps on ends.
The corner posts should run from 3 4 inch 1 9 cm below the bottom of the starter strip to just beneath the eaves after the soffit pieces have been installed.
Installation of our everlog siding is simple and can be completed by any contractor or do it yourselfer.
Install 1 2 inch 12 7 mm foam sheathing strips on both sides of each corner then install your corner siding pieces to these strips.
Mark the siding with a clearly visible line.
Because everlog siding comes in stock twelve foot lengths it will need to be cut to fit.
Mark the siding with a clearly visible line.
Mark the siding with a clearly visible line.
Measure length of siding needed again allowing for one eights inch gaps on ends.
You should be able to wiggle the siding slightly.