Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
How to install drip edge on new roof.
Make sure the outer edge extends over the gutter.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
Place a nail at one end then the other.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Once free slide the drip edge out and discard.
Overlap two pieces of flashing that meet end to end by at least 1 inch.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
To cut the drip edge use a metal snip.
Measuring and cutting the drip edge the next step on how to install drip edge on shed roof is to do all the measuring followed by cutting the drip edge.
Space the fasteners by about 12 inches.
How to install a drip edge.
Add the drip edge using drip edge with a nailing edge approx.
It can be done.
Secure the drip edge with roofing cement.
If it doesn t pull the drip edge out slightly from under the shingles.
How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Slide the corner tight to the fascia.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
Be sure to tuck the drip edge under the starter strip and felt paper.