Apply a row of 8 inch wide metal flashing over the break in the gambrel 4 inches above and 4 inches below.
How to install drip edge on a gambrel roof.
Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing.
Place corner pieces where panels will meet bends at the edge of the roofing.
How to install a drip edge.
With without rain gutters.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
Screw the walls to each other at the corners using 3 1 2 screws every 8 in a staggered pattern.
Install the cut row of panels overlapping the flashing.
Learn more about drip edge at.
Please like and subscribe for more instructional videos.
Next install the drip edge starting from a corner.
First measure the length of your eave.
If it doesn t pull the drip edge out slightly from under the shingles.
Install edging use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
If you have a 12 eave then you ll need one entire piece of drip edge plus another 2 and a few inches.
It is easier to start with the side walls and then add the front and back.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.
A gambrel roof is very common on barn roofs and barn style homes.
At the top corners of the walls where the top boards overlap screw each corner together with a pair of 3 screws.
Line the eave drip edge so that 1 of the drip edge extends beyond the fascia board edge.
Tools supplies tin sn.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Nail the flashing in place with 1 1 2 inch roofing nails.
Secure the drip edge with roofing cement.
Install an end strip of rubber butyl at the top edge of this row fitting it snugly into the profile of the metal.
Installing drip edge on your roof.