If it doesn t pull the drip edge out slightly from under the shingles.
How to install drip edge on a flat roof.
Secure the drip edge with roofing cement.
But do not push it through the fascia.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.
Install drip edges on the eaves first.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
Raise the shingles and push the top rim of your drip edge beneath them.
If using a type c drip edge you can install a furring strip to increase its performance.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
Tack the end into position with the roofing nails and press the nail within the drip edge and into the roof covering.
Make sure the outer edge extends over the gutter.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Learn more about drip edge at.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Coat the flat part of the flashing that sits on the deck using a putty knife.
Apply roofing cement when installing drip edge on an existing roof.
Place a nail at one end then the other.
How to install a drip edge.
Place the drip edge down aligning it so water will drip into.
This lets any water that gets on the roof run down the underlayment and over the drip edge.
Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Be sure to tuck the drip edge under the starter strip and felt paper.
Slide the corner tight to the fascia.