Fiber cement siding expands and contracts.
How to install cement siding on a house.
Measuring and cutting fiber cement 1.
Apply caulk to the joint before and after installing the siding.
Be sure to install the fasteners 1 inch from the top edge of the plank and not near than inch from the bottom end of the plank.
Nail 1 1 2 inch thick wooden furring strips to the concrete wall at 4 foot intervals using concrete nails.
Apply a vertical bead of caulk at each end of the wall.
How to cut nail and install durable fiber siding plus caulking and painting tips.
Install a strip of insect netting along the bottom edge of the concrete wall by nailing the.
How to install siding on concrete block house.
Leave a small gap at butt joints and fill.
Wear eye and breathing.
How to install fiber cement siding safety first.
If the wall you re covering is wider.
Wear safety glasses when cutting and nailing fcs.
Down preassemble the corners install fiber cement using a few special techniques layout the siding courses remove the plastic last flash the butt.
When installing fiber cement siding always leave a gap at the ends of each length of siding.
Cut a length of fiber cement clapboard siding inch shorter than the width of the front wall.
Be sure the flashing overlaps the siding course below.
Subtract 0 125 in 0 32 cm at each end when measuring fiber cement.
When installing fiber cement siding be sure to leave at least clear space between the siding and the flashing vertical siding should be installed and attached to the structural framing when a non structural sheathing gypsum board or foam type sheathing are used.
Fiber cement siding tolerances and gaps.
Measure the siding so it ends on a stud if it is too short to span the wall.
Inspect siding carefully for damage when it arrives.
Fiber cement is tougher than other materials hold the starter 1 4 in.
The number of strips you need.
Use ear protection when cutting siding with a circular.
Score the cut line with a utility knife and snap the siding in two.