Leave about a quarter inch space between each shingle so they can expand naturally.
How to install cedar roof shingles.
Begin installation in corner.
How to install cedar roofing shingles getting the material.
Planning and preparation roofing felt as with most roofing efforts you ll want to start your installation.
How to do it.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
This will provide you an even surface for the new ones.
When adding cedar to your roof you d be.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
The first thing you ll want to do is figure out how much material you should buy.
Install roofing felt before you take a hammer to those shingles you ll first need to install the roofing felt.
Make sure the existing shingles are nailed down well and you aren t missing any shingles.
To prepare the exterior walls apply building wrap for a water resistant barrier beneath the shingles.
Installing over existing shingles unless the shingles you have are badly damaged or you have three layers or more you don t need to remove the old shingles to install new cedar shingles.
Next you ll be prepping the roof to install your shingles.
Non breathable underlay black with 25mm eaves vent system install continuous rafter roll over fascia.
Check the felt paper.
Cover the roof with roofing felt.
Read the full post.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
Learn how to install cedar shingles.
Then add shingles above that with the thick part at the bottom.
Starting at the bottom row overlap each shingle at least an inch and a half over the edge of the roof with the thick end at the top for the bottom row only.
How to install cedar shingles on a shed roof step 1.
Non breathable underlay battens non breathable underlay does not need to be counter battened.
Secure it to the.