Climb a stepladder and locate the ceiling joists on either side of where you wish to mount the heavy ceiling light fixture.
How to install a heavy fixture on a wooden roof.
Glue a strong magnet to the end of a small stick or dowel.
If nailing into the drywall insert nails at a slight angle and apply a small amount of construction adhesive to back of each plank with a caulk gun.
Working through the channel measure the distance between the joists and cut a 2x4 to this length.
Measure the ceiling junction box or j box you will use for the project.
Secure the screws but do not overtighten.
Place the first screw about 7 inches from the bottom and each subsequent screw about 18 to 24 inches apart along the vertical run.
Walk down the hardware aisle of any home center and you ll find an overpowering array of wall anchors and picture hangers.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
All suggestions are appreciated would really prefer suggestions from.
Nail it every couple of feet.
I know how to connect a light fixture my only concern is the wire sitting on wood.
Attach a joist hanger to each end of the 2x4 keeping them flush not protruding past the end of the wood.
J boxes contain all the wiring connections you need to run electricity to the chandelier and they are designed in different models that support a finite amount of weight.
Do i have to somehow install a box if so my concern is that the drilling is right in the middle of the beam the beam is a direct support for the roof.
Pick up a pack of strong earth magnets from your local craft store then hot glue them to the bottom of the small stick or dowel that s about 2 to 3 in 5 1 to 7 6 cm long.
Install the roofing screws vertically along each rib in the panel.
Wait for the glue to dry completely so you can use the stick as an impromptu stud finder.
Use a tin snips to cut the drip edge to size.
Place a 1 1 2 inch deep electrical junction box against the ceiling with.
If you are installing the chandelier in place of an existing fixture a j box will be present.
Start on side of room that is most visible.
Place first plank flush against wall and nail into ceiling with a finishing nailer.
The washer under the screw head should seal to the surface of the panel without bulging or shifting.
Attach a fan rated outlet box to the midpoint of the 2x4 where you want the fixture to be.
While it s easy enough to drive a nail or screw into a stud you may not know how to secure items to the wall between studs or in hard surfaces like brick or concrete.