Extend the tiling battens 45mm beyond the bargeboard brickwork or gable ladder.
How to fit dry verge system to existing roof.
The starter insert is a solid block that seals the first verge tile to the roof so moisture insects animals or anything else can t access the verge.
Position the second verge unit in the slots of the first one if the product features slots.
Take the insert align the rails with the slots on the dry verge and slide it into place.
Manufactured from modern plastic material coroverge is very quick and easy to install.
A dry verge system that fits both the right and left hand side of the roof is also available for all other redland interlocking concrete tiles.
The insert may click or snap into place.
Fit the first dry verge section ensuring that it is located onto the eaves closer.
Dry verge system which acts as a closure on the roof verge of houses garages and porches to protect tiles from wind uplift pest infestation and weather degradation in accordance with bs 5534.
As each successive verge tile is laid slide on a universal dry verge unit upto the tile toe engaging with the unit below nail in position through the batten end clip into the batten.
Combining strength and resilience with an.
If working on a flex dry verge system ply the verge unit open and push it onto the tail of the first verge unit ensuring the end of the verge lines up with the end of the tail and nail the top into the batten end clip.
Nail in position through the batten end clip into the batten.