In some situations you may have to temporarily remove the siding and replace it after installing the underlayment shingles and flashing.
How to felt paper a roof.
Step 5 secure ends.
Tack the felt onto the initial rolling spot using a tack gun.
Attach where roof meets wall where the roof meets a wall lap the felt up 4 inches if possible.
Clean the decking as well as.
How to lay roofing felt on a hip roof step 1.
Step 3 overhang paper.
Use a ladder to reach the bottom level of the roof.
You will be placing the second layer of felt over this.
Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it.
How to install roofing paper.
You wan walk over the roof to remove any air bubbles that may form.
Step 4 over the peak.
The bottom end of.
Continue pulling the felt tight.
A third layer of felt needs to be placed.
As you work the paper can be tacked down in the center so it won t blow away.
Begin your first row of tar paper with the bottom of the tar paper slightly hanging over the edge of the roof.
Paint a thin layer of adhesive over the first felt layer.
Begin at the bottom right or.
The roofing felt should be applied in layers that overlap.
Divide the area of your roof by the area of the felt rolls you plan to use and allow an approximate 10 extra for waste.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof.
Step 2 roll it out.
Roofing felt comes in rolls that feature.
Return to the side that you began rolling from and.
Start the roof felt at one bottom corner of the roof.
Step 1 prep the area.
Roofing felt is sold in rolls and the product label will give information on the area contained.
There needs to be an overlap in the felt to help increase the water tight quality.
Start at the bottom of one side of the roof at the right or left edge.
Attaching your roof felt 1.
Roll out the tar paper along the.
An assumption is made all materials are ordered based on the necessary measured requirements.